Assessing the Feasibility of integrating SITI MINI HYDROS onto the main Grid.
(2020-12-18)
Siti 1 (6.2 MW) and Siti 2 (16.5 MW) are off grid hydro power plants (HPPs) situated along
a Kwen-Bukwo-Suam UEDCL line, which is along the Mbale-Kumi 33kV Kapchorwa T-Off
network in Bukwo District in Eastern Uganda. The ...
Assessing the feasibility of integrating SITI MINI HYDROS onto the main grid.
(2020-12-18)
Siti 1 and Siti 2 hydro power plants (22.7 MW) are in Bukwo District in Eastern Uganda and
power produced by the two hydro power plants is used for local demand. However, integration