A feasibility study on in-pipe electricity generation for NWSC Uganda.
A feasibility study on in-pipe electricity generation for NWSC Uganda.
Date
2024-06
Authors
Magala, Jordan
Journal Title
Journal ISSN
Volume Title
Publisher
Makerere University
Abstract
This feasibility study explores the potential for in-pipe electricity generation within the existing water transmission infrastructure of the National Water and Sewerage Corporation (NWSC) in Uganda. The project evaluates the practicality of deploying a small-scale hydropower sys- tem to harness energy lost in water transmission lines, providing a renewable energy source to power water plant utilities and other local applications. Data collection, network model- ing, and simulations were conducted at two sites, Nabuyonga and Nabijjo reservoirs, to assess technical, economic, and environmental viability. The study reveals significant potential for energy generation, with Nabijjo site showing a higher power output due to favorable phys- ical characteristics. Economic analysis indicates competitive costs compared to traditional hydropower, while environmental benefits include reduced carbon footprint and sustainable en- ergy utilization. Recommendations include initiating a pilot project at Nabijjo, further research on advanced turbine designs, stakeholder engagement, and continuous performance monitoring.
Description
A project report submitted to the College of Engineering Design and Art in partial fulfillment of the requirement for the award of the degree Bachelor of Science Electrical Engineering of Makerere University.
Keywords
In pipe electrical generation,
NWSC Uganda.
Citation
Magala, Jordan. (2024). A feasibility study on in-pipe electricity generation for NWSC Uganda.