Development of Pico hydropower system model for efficiency improvement

dc.contributor.author Mugabi, Davis
dc.contributor.author Owino, Charles
dc.date 2018
dc.date.accessioned 2018-06-15T08:17:42Z
dc.date.available 2018-06-15T08:17:42Z
dc.description.abstract This project considers the improvement in efficiency of a Pico hydropower system by use of a battery aimed at utilizing power wasted in the dump loads. The battery charges during the off peak hours and discharges during the on peak hours. During the on peak hours, supply of power is from both the battery and the generation station. This allows the consumers to be connected at the same time when the fridge is operating which is not the case with the current operating system.
dc.identifier.uri http://hdl.handle.net/20.500.12281/4216
dc.language English
dc.subject Electricity
dc.subject Hydro power systems
dc.subject Renewable Energy
dc.title Development of Pico hydropower system model for efficiency improvement en_US
Files
Original bundle
Now showing 1 - 2 of 2
No Thumbnail Available
Name:
Mugabi-CEDAT-Undergrad.pdf
Size:
2.7 MB
Format:
Adobe Portable Document Format
Description:
Undergraduate Dissertation
No Thumbnail Available
Name:
Owino-CEDAT-Undergrad.pdf
Size:
1.98 MB
Format:
Adobe Portable Document Format
Description:
Undergraduate Dissertation