Design and assessment of a grid-integrated battery energy storage system to improve the reliability of the Ugandan power grid: a case study of Kireka distribution network

dc.contributor.author Beine, Ian Matthew
dc.date.accessioned 2025-10-31T07:14:58Z
dc.date.available 2025-10-31T07:14:58Z
dc.date.issued 2025
dc.description A dissertation submitted to the Department of Electrical and Electronics Engineering, Makerere University for the award of Bachelor of Science in Electrical Engineering of Makerere University en_US
dc.description.abstract This report presents a detailed analysis and assessment of battery energy storage systems (BESS) on grid reliability. Grid reliability refers to the electric grid's ability to consistently and dependably deliver electricity to customers. It is crucial to have a consistent power supply, as it is required for the socioeconomic development of any nation, as it affects businesses, critical loads such as hospitals, and many others. However, in some parts of Uganda (mostly rural areas), the power system is considered unreliable by the consumers due to frequent and long power outages in those areas. Faults at the transmission level or generation sources often cause these long power outages. To address this issue, the solution proposed is a grid-integrated battery energy storage system at the distribution level of the power system to supply power to distribution networks during the failure of the primary supply, thereby improving reliability. This project involves designing an optimized BESS model considering parameters such as energy density, power density, cycle life, self-discharge rate, and battery technology. The BESS model is integrated into a model of a selected distribution network (Kireka distribution network) while optimizing its impact on grid losses and voltages at different buses. Using DIgSILENT PowerFactory, the Kireka 33/11 kV network was built and validated against UMEME’s field data. Its reliability was then measured with the CAIDI, CAIFI, and ENS indices before and after integrating a BESS. The storage system was modeled directly in DIgSILENT for network‐level simulations and also recreated in MATLAB to plot its state of charge, discharge duration under varying loads and capacities, and other key behaviors. This combined approach gave clear insight into how the BESS performs in real operating conditions. The integration was done in two ways: one where the BESS was gridtied and one where it was grid-isolated. The grid-tied BESS means the BESS stays connected to the grid and supports it by charging during low demand and discharging during peak demand or outages. And the grid isolated means the BESS operates independently and only discharges when the grid goes down, acting purely as backup power. The simulation results show a significant improvement in the reliability of Kireka distribution network’s power supply through the reduction of both duration and frequency of power outages, indicated by a 61 % improvement in CAIFI and an 89 % improvement in CAIDI for the 8 MW grid-tied BESS. The developed system model can be a basis for research on the scalability of grid-integrated battery energy storage and can help improve grid reliability in various parts of the country en_US
dc.identifier.citation Beine, I. M. (2025). Design and assessment of a grid-integrated battery energy storage system to improve the reliability of the Ugandan power grid: a case study of Kireka distribution network; Unpublished dissertation, Makerere University, Kampala en_US
dc.identifier.uri http://hdl.handle.net/20.500.12281/20884
dc.language.iso en en_US
dc.publisher Makerere University en_US
dc.subject Grid-integrated battery en_US
dc.subject Energy storage system en_US
dc.title Design and assessment of a grid-integrated battery energy storage system to improve the reliability of the Ugandan power grid: a case study of Kireka distribution network en_US
dc.type Thesis en_US
Files