The use of project alternatives in environmental and social impact assessment in Uganda

dc.contributor.author Namyalo, Deborah
dc.date.accessioned 2021-02-15T11:38:24Z
dc.date.available 2021-02-15T11:38:24Z
dc.date.issued 2021-01
dc.description A dissertation submitted to the Department of Environmental Management in partial fulfillment of the requirements for the award of a Degree of Bachelors of Environmental Science, Makerere University en_US
dc.description.abstract Environmental Impact Assessment (EIA) is intended to integrate the environment into decision making for a proposed course of action and consideration of alternatives at the strategic level. For EIA to guide strategic decision-making, the range of alternative courses of actions to meet the development objective with reduced impacts on the environment should be iterated. The alternatives analysis is often much less rigorous, and many EAs for smaller projects often analyze only the action proposed. This study aimed at assessing the relevance of EIA in improving project designs for purposes of ensuring sustainable development specifically to evaluate the use of alternatives in improving the proposed project design. Both quantitative and qualitative using conducive sampling were used. The study was be conducted using desk review method; it included data collection basing on already existing data from EIA reports of different developments. From the study, 10 alternative types were discussed and they included no action and location, which were most, discussed, technology, activity, design, operational footprint, production, material substitution, timing and routing. The results showed that the section on project alternatives was the least emphasized (p<0.05) compared to other sections of the report based on the space in the report dedicated to discussing project alternatives and this was not different across project categories (F= 1.141, p = 0.338). It’s concluded that the ESIA process does not achieve its potential of improving project design if alternatives to the proposal are not assessed. Its recommended that guidelines for ESIA should be strengthened at ESIA review stage to ensure that alternative are adequately covered. en_US
dc.identifier.citation Namyalo, D. (2021). The use of project alternatives in environmental and social impact assessment in Uganda. Undergraduate dissertation. Makerere University en_US
dc.identifier.uri http://hdl.handle.net/20.500.12281/8809
dc.language.iso en en_US
dc.publisher Makerere University en_US
dc.subject Project alternatives en_US
dc.subject Environmental Impact Assessment en_US
dc.subject Social Impact Assessment en_US
dc.title The use of project alternatives in environmental and social impact assessment in Uganda en_US
dc.type Thesis en_US
Files