Show simple item record

dc.contributor.authorNambejja, Judith Birungi
dc.date.accessioned2021-11-23T07:11:12Z
dc.date.available2021-11-23T07:11:12Z
dc.date.issued2020-12
dc.identifier.urihttp://hdl.handle.net/20.500.12281/11021
dc.descriptionA dissertation submitted to the College of Engineering, Design, Art and Technology in partial fulfillment for the award of Bachelors Degree in Quantity Surveying of Makerere University.en_US
dc.description.abstractThe high cost of building materials, such as clay bricks, among others, has made building construction products expensive in Uganda. Since wall construction is one of the major components of the entire building process, this paper sought to compare the construction cost and time of clay bricks to earthbags in building walling systems in order to find out if there is a possibility of adopting the earthbag wall system as a means of making wall construction of building affordable houses in Uganda. A cost and time analysis of the construction of an earthbag and clay brick wall was done and experimental observations of the processes were made to identify the extent to which each system falls in line. Samples of an earthbag and clay brick walls of equal size 2.4x1m high were constructed on a flat surface/platform and the construction cost and time data was collected and recorded. To determine whether there were any significant differences between these two walls, tables showing values of the cost and speed of construction of each of these walls were prepared and results obtained. Results showed that there were significant differences between construction cost and speed of construction using the two systems of construction. The total construction cost of the clay brick wall, (inclusive of the materials, tools, and labour, associated with the construction of the brick wall) was Ushs. 361,150 while the total construction cost of the earthbag wall, (inclusive of the materials, tools, and labour, associated with the construction of the brick wall) was Ushs 502,310. Construction of the clay brick wall took 110minutes or 1:50 hours and plastering of this wall took 38 minutes, while Construction of the earthbag wall took 293 minutes or 4:53 hours and plastering of this wall took 166minutes or 2: 46 hours Results showed that the use of earthbags does not make the wall construction process cheaper nor faster than the use of clay bricks.en_US
dc.language.isoenen_US
dc.publisherMakerere Universityen_US
dc.subjectEarthbagen_US
dc.subjectClay bricken_US
dc.subjectConstruction materialsen_US
dc.subjectBuilding materialsen_US
dc.subjectWalling systemsen_US
dc.titleA cost and time analysis of earthbags and clay bricks as building wall systems un Ugandaen_US
dc.typeThesisen_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record