Show simple item record

dc.contributor.authorOchengel, Zurah Namunobwa
dc.contributor.authorNamutegere, Joshua
dc.date.accessioned2023-01-13T13:15:51Z
dc.date.available2023-01-13T13:15:51Z
dc.date.issued2022
dc.identifier.citationOchengel, Z. N. & Namutegere, J. (2022). Dam break analysis to determine the outflow hydrograph and flood inundation impact of Isimba Dam, Kayunga District (Unpublished undergraduate project report). Makerere University, Kampala, Uganda.en_US
dc.identifier.urihttp://hdl.handle.net/20.500.12281/14202
dc.descriptionA research project report submitted to the Department of Civil and Environmental Engineering in partial fulfillment of the requirements for the award of the Degree of Bachelor of Science in Civil Engineering of Makerere University.en_US
dc.description.abstractDams are essential for water supply, hydropower generation, flood control, irrigation, recreation and navigation. There are several dams in Uganda for example, Bujagali dam, Owen falls dam, Isimba dam among others. The case study considered was Isimba dam located on Victoria Nile in Kayunga district. Though on rare occasions, dam breaks result into floods hence damage to people and property. The main objective of this study was to predict the resulting flood in the event that Isimba dam breaks and the area that would be covered by that flood. To achieve this, a model having the river, dam and two 2D flow areas was created in HEC-RAS this constituted the geometry. The model was calibrated using flow data. Four scenarios were made with respect to the dam types, sunny day failure and hydrologic failures. The results from analyzing the scenarios in HEC-RAS were viewed from the RAS mapper and extracted to Arc-GIS and excel to map the inundated villages and draw hydrographs downstream. The hydrographs downstream showed how the flood attenuated downstream. To obtain the impact on the bridge, profile lines were used to extract water surface elevations that were compared with the design elevations of Isimba Bridge to conclude on the bridge’s failure. For all scenarios, the bridge did not fail. Inundated areas of 78.9km2, 79.2 km2, 79.2 km2 and 75.3 km2 were obtained for scenario 1, 2, 3 and 4.en_US
dc.language.isoenen_US
dc.publisherMakerere Universityen_US
dc.subjectDam break Analysisen_US
dc.titleDam break analysis to determine the outflow hydrograph and flood inundation impact of Isimba Dam, Kayunga Districten_US
dc.typeThesisen_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record