Search
Now showing items 61-70 of 183
Detecting Sulphur dioxide in the Albertine Region.
(2019-10-10)
The concept of monitoring sulfur dioxide (SO2) and other gaseous pollutants from satellites
using remote sensing in ultraviolet (UV) and infrared (IR) spectral bands was suggested long
before satellite instruments capable ...
Assessing labor management and productivity on construction sites in Kampala.
(2019-12-02)
The construction industry is one of the key national development priorities in most economies. The construction industry plays a vital role in the socioeconomic development of the country and has several multiplier effects ...
The challenges of planning for and managing excess storm water in Mankindyessabagabo municipality: A case study of Kalidubi zone.
(2019-01)
The continuation of excess storm water management challenges in Kalidubi zone is due to
existing poor strategies coupled with increased encroachment on the flood zone. This study is
therefore aimed at identifying ways ...
An investigation into Batwa Housing. A case of Nyarusiza in Kisoro District.
(2019-05-10)
Throughout history, the Batwa indigenous community survived on forest ecosystems for food, medicine and shelter. Lately in 1991, the forest dwellers were evicted from Virunga forests to give way for the mountain gorilla. ...
An Investigation into Low Occupancy of Space in Mixed Use Commercial Buildings in Kampala’s CBD (A case of selected buildings along Kampala road)
(2019-08-08)
Kampala’s Central Business District (CBD) has various buildings undergoing construction annually. However, there is a problem of low occupancy of space in these buildings. While buildings have gotten, higher and use variety ...
Assessment of need for “ALL –TRAFFIC’’ road network system in Kampala city, Case study of Ntinda ward.
(2019-01)
This study was conducted in Ntinda ward with in Nakawa division, Kampala city . The study
discussed the importance of road infrastructures to various road users for example motorists,
cyclists and pedestrians. According ...
Assessing the impact of the delayed issuance of construction permits on the timely commencement of construction projects.
(2019-06)
The construction industry is large, volatile and requires tremendous capital expenditures. Delay
is generally acknowledged as the most common costly problem encountered in construction
industry. It results into frequent ...
Investigating the Causes of Discrepancies between Design and Construction in the Building Construction Industry in Uganda.
(2019)
This report is for the research topic investigating the causes of discrepancies between design and construction in building construction projects in Uganda. Building construction is accompanied with many changes which may ...
Assessing the effectiveness of land administration system in promoting land titling in Uganda
(2019-12-04)
The continued existence of untitled land in Uganda has yielded to an increase in a number of cases concerning tenure insecurity evidenced by the common vice of land grabbing as discovered by the commission of inquiry into ...
Determining the causes and sources of Variations on road construction projects.
(2019-12-06)
Roads play an important role in the growth of developing countries as they are the most
convenient means of transport for movement of people and freight within and outside cities.
Road construction therefore is a prime ...